Polysan A/S
CMS123.com Print  Sitemap  Login       
Exhibition Products About Polysan Contact
Installation

N20 and N30 channels should be embeded in a high quality concrete. Installation should always start from the outlet end of the run. Make sure that the concrete surround is 3-5 mm above the level of the channels. For N20 with frame remember to add 30 mm to the building-in height which corresponds to the height of the frame.

 

Class A/B C E F
Min.t in mm 100 150 200 250
Concrete quality B15 B25 B30 B30

 


     
     

Polysan A/S  •  Industrivej 17  •  DK-5672 Broby  •  Telefon: +45 62661221  •  Fax: +45 62661521